1

I am learning to create Use Case diagrams using the UML specification, but I have a couple of doubts about Use Case relationships which I cannot solve on my own.

My question regards two different situations:

  1. the completion of a specific Use Case is a pre-condition for the execution of another Use Case. I have seen in some article that a "precedes" connector is suggested, but I don't find anything similar in UML ("precedes" and "invokes" relationship should be defined in the OML specification). The "include" relationship of the UML 2.5 specification seems suitable in some scenarios, but not in all of them.
  2. there is an alternative (i.e. optional) flow during the execution of a Use Case, which can also be identified as a different Use Case which is meaningful independently. Reading the "exclude" relationship description, I understand that "the extending UseCase typically defines behavior that may not necessarily be meaningful by itself". Also, some articles says that "The extending use case is dependent on the extended (base) use case" (i.e. doesn't make much sense on its own). I'm not sure that "extend" is the proper relationship in such a situation.

I have faced both situations while designing the same diagram, thus I will report it here for completeness and a better understanding (I haven't already included all the system Use Cases in the diagram):

  1. The User must be logged-in the system before re-scheduling a booking (some articles suggest this to be an "include" relationship), and the User must be viewing the booking to "trigger" the re-scheduling Use Case (this is more close to a "precedes").
  2. If no suitable alternatives are available during re-scheduling, the User should be able to Delete the current booking (instead of re-scheduling it).

Booking System UML Diagram

  • 1
    As always: log-in is no use case. It's a pre-condition for certain use cases. Recommended read: Bittner/Spence about use cases. – qwerty_so Mar 22 at 10:17
  • Thanks, @qwerty_so, I missed your comment earlier. I have taken a look at the book (chapter 8) and made further research on that: now it makes sense to me not to consider log-in as a use case! – Nik Manzotti Mar 22 at 19:16
  • Fine :-) Managing use case synthesis is quite difficult. Especially for people comming fom a developement focused area(speaking from own exoerience). – qwerty_so Mar 22 at 20:15
5

Use-cases are not intended to have any sequencing between them.

Use-cases are meant to represent interactions with the system that are of value for the actors (i.e. use cases correspond to goals of the actors). UC are in no way detailed specifications of the actions that will happen and their owrder. It's just a placeholder for such specifications.

Use cases are in principle independent from each other, with the exception of the include and the extend relation, which are intended to promote reuse of common behaviors/sub-goals/interactions.

If you want to sequence behaviors, you should consider UML activitiy diagrams or BPMN diagrams.

| improve this answer | |
  • ... or pre-conditions/constraints. – qwerty_so Mar 22 at 10:16
  • 1
    @qwerty_so Right, but they don’t belong on use case diagrams, just in the associated use case report, which is sequenced. – Peter K. Mar 22 at 12:06
  • @PeterK. A UC report contains sequenced activities/actions,. But not sequenced UCs. Whether or not to show a constraint on a diagram depends on the intended readship. – qwerty_so Mar 22 at 12:56
  • Thanks, I think I'm getting it! So, in my example, it is correct not to connect UC representing actor goals or valuable interactions (Find, View, Delete, Re-Schedule booking) and to connect other behaviors separated for reuse (check service and resource availability, can be shared with "create booking"). The "Log-in" constraint could be seen as a shared behavior for all the other UC ("include"), but it shouldn't be read as a sequenced step (e.g. the user can be logged-in already). – Nik Manzotti Mar 22 at 14:28
  • @NikManzotti That’s it! – Christophe Mar 22 at 14:33

Your Answer