I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Edit - Some good answers so far, but I am interested to hear further perspectives. I'll mark one as accepted by the end of the day.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Edit - Some good answers so far, but I am interested to hear further perspectives. I'll mark one as accepted by the end of the day.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Question Protected by gnat
added 135 characters in body
Source Link
Countingstuff
  • 750
  • 1
  • 5
  • 8

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Edit - Some good answers so far, but I am interested to hear further perspectives. I'll mark one as accepted by the end of the day.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Edit - Some good answers so far, but I am interested to hear further perspectives. I'll mark one as accepted by the end of the day.

Became Hot Network Question
added 2 characters in body
Source Link
Countingstuff
  • 750
  • 1
  • 5
  • 8

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that I and my colleagues and I are assigned tasks with no thought put into the design before I'mbeing told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that I and my colleagues are assigned tasks with no thought put into the design before I'm told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

I'm a junior engineer, but I've worked at two companies now. In both cases I've found that my colleagues and I are assigned tasks with no thought put into the design before being told to do it.

Typically I spend about 90% of my time writing down on paper how I'm going to do the task, then the code sort of writes itself in maybe a day, sometimes two if I run into difficulties with an API.

Is there something strange about this picture? Is the design supposed to be the work? I don't really begrudge it, I quite like the designing of things.

But it seems to me it would be more productive to together as a team determine the design of everything to be done, and then everyone can go away and do it pretty quickly, this would put everyone on the wavelength, and so there would be less instances of interfaces not being as you'd like. I feel that once the design is done, the coding is essentially a series of 'write a function which takes in X and does Y', which anyone can easily do except perhaps in the case of some complex algorithm being required.

I am thinking of asking my team if we could try designing things up front, before assigning the work. But I am not sure if they will be up for this, or if it's a ridiculous idea and that's why I've not seen anyone do it.

Source Link
Countingstuff